Recommended News

Hand chain Block

HSZ-80A/B series hand chain block

HSZ-80A/B series hand chain block

  • Product Detail
  • Technical Parameters
Product name: HSZ-80A/B series chain block
Product Category: Chain block
Product description: HSZ-80A/B series hand chain block is the newest product launched by our factory with advanced design, reliable quality and excellent performance. It has the excellent performance of HS Z-8 0 series hand chain block. It breaks through the traditional circular structure and adopts an equilateral triangle arc to make the product shape more novel and beautiful, which is in line with contemporary trends. HSZ-80A/B series hand chain block are widely used in various fields such as factories, mines, docks, warehouse construction sites, agricultural production, etc., for lifting goods and lifting equipment. Especially when working without power or in a small space. It also shows superiority. This series of chain block can be used with monorail cranes to form a lifting transport trolley for monorail overhead transportation, or for manual single beam cranes and cantilever cranes. HSZ-80A/B series hand chain block are designed and manufactured according to JB T7 3 3 4-9 4 standards. The main parts and the performance of the whole machine have been strictly inspected and tested. The reliability of the product is greatly improved to ensure the safety of use^ The main features of HSZ-80A/B series hand chain block: the use of Z (heavy) grade working level, reliable performance and durability. Using 800Mpa high-strength lifting chain, high safety factor and long service life. Compact and reasonable structure, beautiful and novel appearance. The transmission is stable, the efficiency is high, and the pulling force is small. Double pawl, double guide wheel structure, more safe and reliable. Small size, light weight, easy to use.

Chain Block
Matters needing attention in operation
1. Choose a safe and reliable lifting point when operating the chain hoist. It must be commanded by someone and should be tested first. When the heavy object leaves the ground, the hook head, wire rope sleeve, rigging, etc. must be checked again in detail, such as a stable center of gravity , Normal operation and reliable braking before lifting.
2. During operation, the person operating the chain hoist shall not stand on the heavy object, and shall not leave the site when the heavy object is suspended and stays in the air.
3. It is strictly forbidden for anyone to pass, walk or stay under heavy objects during lifting.
4. Do not use non-manual way to drive the chain hoist to lift heavy objects. When it is found that it cannot be pulled, the pulling force shall not be increased. The use shall be stopped immediately and the heavy object shall be checked for adhesion with other objects, whether the weight of the heavy object exceeds the rated lifting weight, and whether the hand chain hoist parts are damaged.
5. The distance of ascending or descending heavy objects shall not exceed the prescribed lifting height to prevent damage to the machine parts.
6. It is strictly forbidden to use two or more hand hoist to lift the same heavy object at the same time.
7. In use, a special person should be set to monitor the safety of the lifting point, wire rope, rigging, and personnel operating the chain hoist. The personnel operating the chain hoist must be even in force, and should not stand within the range of the lifting chain's force and bounce Prevent chains from falling apart.
8. Large, medium-sized equipment installation, removal, movement (extension) must be prepared with targeted safety technical measures, which will be implemented after approval by the company.

Previous: HS-C series hand chain block

Next: None