Recommended News

Industry News

Why take a break during the work of group hoist

2020-09-05 11:12:55Beijing Lieying
The electric hoist works in an intermittent operation system during daily work, and a period of rest is required for each period of operation. This is to better ensure the function and life span of the electric hoist. The same is true for the group hoist, which should take a proper rest during the use period and increase the number of shutdown checks. The demand for group hoisting electric hoists should be based on the lifting height and construction progress of each floor, and the number of center downtime inspections should be adjusted appropriately. Most of the operation centers on each floor will be down for inspection 2-3 times during normal operation. If the floor height increases, it should be increased appropriately The number of downtime inspections; on the top floors, not only the number of downtime inspections needs to be increased, but also the supervision of the operation status of the electric hoist must be strengthened, because with the increase of the total load, the probability of overloading the electric hoist will increase.
electric hoist

Previous: Industries that need climbing frame electric hoist

Next: None