How to install high-rise electric hoist

2020-06-20 15:43:56Beijing Lieying
The construction hoist electric hoist is an electric hoist that plays an important role in the construction of the national economy. At present, the establishment of every high-rise building is also inseparable from the use of the construction climbing frame electric hoist. The construction climbing frame electric hoist is also outside the high-rise whole The application of climbing frame is also very extensive. The detailed installation techniques are as follows: before installation, the design drawings should be read in detail, and the beam and building climbing frame hoist should be installed according to the weight required by the bracket. And drill holes for bolts at the design location. The position of the bolt holes in each layer needs to be consistent, so that the bracket can be stable and vertical, and the error during installation is not allowed to be higher or lower than 10mm. At the same time, the basic parts such as wire ropes, load-bearing supports, beams and fasteners are processed. It should be noted that since the height of the upper floors of the high-rise building does not match the group floors, the actual connection of the external price should be installed from the top of the podium, which can reduce the height error. When the electric hoist is installed as a whole, the base bracket of the scaffold should be erected first when the outer climbing frame is installed as a whole. Ordinary steel pipes can be selected for use. Then continue to install the bearing bracket on the base bracket, and the fixing bolt is located on the inner side of the bearing bracket. The bolts are fixed with the outer beam, and the outer part of the bearing bracket is fixed with the upper side beam, which can play a double guarantee. When setting up the main bracket on the bearing bracket, pay attention to installing the vertical steel pipe first. Then the load-bearing truss is erected, and the connection of the structure is completed by the buckle body. During the construction process, it should be noted that the distance between the top and bottom chords of the load-bearing truss is 3cm. Finally, when the lifting equipment is installed, bolt holes are reserved on each wall, and the gravel in the holes needs to be cleaned, so that the bolts can be firmly combined with the ground. Then install the bearing and lifting rod, it is worth noting that the strength of the lifting rod must reach about 20MPa. After fixing the I-shaped steel frame, you can install the construction climbing frame electric hoist. The motor at each position needs to be numbered. The number is consistent with the specific height number of the climbing frame. The chain of the motor itself should maintain a 90° angle to the ground. When installing the chain, there must be no twisting, turning, etc., and remove the dirty oil on the chain, and install a rain cover for the motor.
Electric hoist

Previous: Will the electric hoist climbing frame price increase

Next: The principle of climbing frame electric hoist lifting program