The overall outer climbing bracket is powered by a climbing frame
electric hoist, in order to raise the climbing frame
electric hoist bracket to any height of the building, the height of the overall outer climbing bracket used for high-rise is about 4 floors of the building, And in the form of double-row scaffolding, it can greatly improve work efficiency. Next, I will explain to you about the installation technology of the electric climbing frame hoist in the construction of the climbing frame as follows: before installation, before installing the outer climbing frame, when reading the design drawing in detail, understand the amount of support required according to the bracket Install the pick beam and electric hoist, and drill the bolts at the design position. The position of the bolt holes in each layer needs to be consistent, so that the bracket can move smoothly and vertically, and the installation position error does not exceed 10mm. At the same time, basic parts such as wire ropes, load-bearing supports, beams and fasteners should be processed. It should be noted that since the height of the upper floors of the high-rise building does not match the group floors, the actual installation of the external climbing frame should be installed from the top of the skirt building, which can reduce the height error. In the overall installation of the outer climbing frame, the base bracket of the scaffold should be erected first. The bracket can be chosen to be made of ordinary steel pipes. Then install the bearing bracket on the base bracket so that the fixing bolt is located inside the bearing bracket. The bolts are fixed to the outer beam, and the outer part of the load-bearing support is fixed to the upper side beam, so that double protection can be achieved. When setting up the main body bracket on the load-bearing support, attention should be paid to the vertical steel pipe. Then the load-bearing truss is erected, and the connection of the structure is completed with fasteners. During the construction process, it should be noted that the distance between the top and bottom chords of the load-bearing truss is 3cm. Regarding the installation of lifting equipment, it is necessary to reserve bolt holes on each wall and clean up the gravel. It is necessary to ensure that the bolt can be firmly combined with the wall. Then install the tension bearing and the lifting rod, where the strength of the lifting rod needs to reach about 20MPa. After fixing the I-shaped steel frame, you can install the electric climbing frame moving hoist. The motor at each position needs to be numbered. The number needs to be consistent with the specific height number of the climb. The chain of the motor itself should be maintained at 90° to the ground angle. When the chain is installed, there must be no twisting, turning, etc., and to remove the dirty oil on the chain, it is necessary to install rain-proof canvas for the motor.
