Climbing frame
electric hoist plays a vital role in the overall climbing frame lifting procedure. Climbing frame electric hoist is a kind of group hoist. Everyone must operate in accordance with the rules and regulations in daily work to eliminate safety hazards. Next, and Let us explain how to regulate the operation of electric climbing frame hoist (1) Withdraw all live loads and construction loads from the frame body, and loosen the fixed tie point between the frame body and the building. Loosen the bolts and diagonal tie rods connecting the bearing support to the building to check the stability of the shelf. Check whether there is an abnormal collision or release between the climbing frame and the building. At this time, the climbing frame should only be connected or contacted with the building by electric hoists, guide rods, guide wheels and lifting steel beams. (2) The construction personnel shall operate in accordance with the relevant regulations in the "Technical Code for Safety of High-altitude Work in Building Construction" (JGJ80) and the "Technical Code of Safety for Construction and Installation Workers" ([80] Jian Gong Lao Zi No. 24). Personnel of each type of work should be basically fixed and hold a certificate to work. (3) When the personnel working on the overall climbing frame are in their respective positions, the commander-in-chief issues an ascending command, and the central control room activates the climbing frame electric hoist to make the overall outer frame rise at a speed of 100mm/min. Pay attention to the scaffold's rising situation, if it is inclined Or when the lifting heights of the hoist chains are inconsistent, immediately send a signal to stop the lifting, and jog the individual hoists that are not synchronized, and then continue the synchronized lifting after maintaining the same level. (4) The electricity used by the construction party shall meet the requirements of the current "Technical Code for Safety of Temporary Use of Electricity at Construction Sites" (JGJ46-2005). (5) After the overall climbing frame is in place, check one by one and confirm that each established tie rod is in a balanced and stressed state, and the guide is properly fixed. Relax the climbing frame electric hoist, use the spare bracelet hoist to lift the heavier equipment to the upper layer and fix it in place, waiting for the next lift. Usually, the chain of the electric hoist is slack. (6) It is forbidden to carry out lifting operations in strong winds, rain, snow, dense fog and at night.
