With the rapid development of all walks of life, the same is true of lifting work items. Climbing frame
electric hoist is suitable for processing workshops, warehouses, docks, construction industry, all kinds of shops and all kinds of shops, and all kinds of modern production lines and assembly lines. The most demanding application during this period was construction project work. The construction hoist electric hoist has its slow lifting speed, stable operation, and has the function of group hanging. Therefore, the climbing hoist electric hoist is widely used in construction work. The appearance of the climbing hoist electric hoist greatly reduces the labor focus of the construction personnel. Electric hoist greatly improves the progress of the project. So, do you understand the operating principle of the construction hoist electric hoist? Let me explain to you the importance of the climbing hoist. When the outer layer climbs up, it is lifted up by the jack supported on the concrete wall. When the building hoist electric hoist climbs, the formwork is 200-300mm away from the concrete wall, and there is no friction resistance. After climbing to the elevation, the corbel on the outer formwork extends into the reserved hole in the concrete wall and bears all the external form components. Together, the jack returns oil from the concrete surface, the outer mold faces the wall surface, corrects the verticality, and initially binds the steel bars, and supports the opening mold. After the rebar ends, raise the inner mold separately. After the inner mold is in place, face the wall, correct the vertical, install the wall screw, fasten, and then cast concrete to protect the concrete strength to 8Mpa, you can increase the previous layer. The supporting rod of jack is not pre-buried in the concrete of the wall, but when the concrete strength reaches 8Mpa, the iron plate under the supporting rod is leveled. The supporting rod transmits the force to the iron plate and then to the concrete wall. After the climb is over, put away the support rods and horns, and install it again the next time. After climbing up into place, the load of the formwork system is not borne by the jacks, but the corbels on the formwork system in the front and back extend into the reserved holes on the concrete wall to bear the force. This is not the same as the hydraulic sliding mode. The force of the climbing process is borne by the hydraulic system, and the application process is borne by the force system on the template. The outer mold climbs one layer at a time, and the inner mold climbs half a layer at a time. Each layer needs to be climbed into place by two consecutive climbs.
